Railed Tunnel Formwork System project 02

1. All kinds of railed tunnel trolly, railed tunnel formwork available,

2. Customized available,

3. Length 6m,9m,10m,12m and customized.

Inquiry Now

Features and advatages of our Railed tunnel trolly,tunnel formwork system

1. Scientific design makes the roof and side wall surface smooth after second time lining,

2. Optimized mechanic design makes reduce the steel cost of the the formwork and save the construction cost, 

3. Standard production: full usage of standard parts,develop university of the formwork,makes the tunnel formwork to be reused more times.

4. Aumotical design of the formwork reduces the labor cost,highly improves the working efficiency and makes the construction more safe. 

5. Modernized factory and Certificate of patent

modern tunnel trolley factory

6. Tunnel Formwork System Project Worldwide

Huai Nan Tunnel Formwork System



Gezhouba Hydropower Station Tunnel Formwork System


LanXin Railway Tunnel Formwork System


Tajikistan Dushanbe-Khorog Road Tunnel Formwork

Macedonia KO Highway Tunnel Formwork System

Jiujing Qu Railed Tunnel Formwork System

Ecuador Hydropower Station Needle Girder Tunnel Formwork

Philipines Hydropwer Station Tunnel Trolley